跳至主要内容

In order to comprehensively improve

In order to comprehensively improve the technical level of the construction industry, the Ministry of Housing, Urban and Rural Construction issued a notice on the promotion and application of '10 new technologies in the construction industry (2017 version)'. , As a first-class builder and the road to the first-class builder you must know: Construction technology of combined aluminum alloy formwork Aluminum alloy template is a kind of light weight, high strength, high processing accuracy, large single block size, less jointing, and convenient construction; at the same time, the template has many turnovers, low amortization cost, high recycling value, and good Comprehensive economic benefits; and has the technical advantages of wide application range, simultaneous wall top pouring, high surface quality of shaped concrete and less construction waste. Aluminum alloy formwork meets the requirements of industrialization of construction, environmental protection and energy saving 3.6.1 Technical content (1) Design of combined aluminum alloy template 1) The combined aluminum alloy formwork is formed by welding aluminum alloy ribbed panels, end plates and primary and secondary ribs. It is a combined formwork for construction of cast-in-place concrete structures. 2) The combined aluminum alloy template is divided into flat template, flat die adjustment template, female angle template, female corner template, male angle template, male angle adjustment template, aluminum beam, support head and special template. 3) The aluminum alloy horizontal formwork adopts independent support. The support heads of the independent support are divided into a plate bottom support head and a beam bottom support head. The plate bottom support head is connected with a single oblique aluminum beam and a double oblique aluminum beam. The support system formed by aluminum alloy horizontal formwork and independent support can realize the early dismantling of the formwork, the input amount of the formwork and the support system is greatly reduced at one time, saving the labor of assembly and disassembly and vertical transportation, reducing the engineering cost, and the construction site is civilized and tidy (see Figure 3.5 ). Figure 3.5 Aluminum alloy template 4) For each project, the aluminum alloy template should be used for mold design. Priority is given to standard templates and standard corner molds, and the remaining parts are equipped with certain mosaic templates. For special-shaped formwork, angle aluminum plywood formwork, wood square plywood or plastic board formwork should be used to fill in the gaps, and strive to reduce the proportion of non-standard formwork. 5) Before each project leaves the factory, pre-assembly is carried out to check the design and processing quality to ensure a successful installation at the time of construction on the site. 6) Aluminium alloy formwork is used for construction, which can be equipped with one-layer formwork and three-layer support, and local adjustment of the cross-section of the member with adjustment plates. (2) Construction of combined aluminum alloy formwork 1) Compile a special construction plan for combined aluminum alloy formwork, determine the division of the construction flow section, draw a plan drawing of the mold, and calculate the required formwork specifications and quantity. 2) Before the formwork is installed, it is necessary to carry out measurement and pay-off and floor copying. If necessary, do a leveling layer plastering strip within the bottom edge of the formwork. If there is local unevenness, a shim can be temporarily added to perform mortar hooking treatment. 3) When tying the steel bars of the wall, correct the lower insertion bars that deviate from the edge of the wall; set concrete braces to control the cross-sectional dimensions of the wall at the corners, in the wall, and above, in, and under the wall height. 4) Install door and window opening templates, pre-buried wooden boxes, iron parts, electrical pipelines, junction boxes, switch boxes, etc., and must pass the acceptance of concealed works before closing the mold. 5) The aluminum formwork is installed in place according to the matching drawing. The formwork is connected by bolts and pins. After the formwork is checked and adjusted vertically, the pull bolt or pull tab is tightened. 6) The arrangement of independent braces and diagonal braces shall be carried out in strict accordance with relevant specifications and formwork construction plans. 7) The construction method of supporting formwork and pouring concrete together with wall, column, beam and slab can be adopted, which requires layered pouring and layered vibration during concrete construction. After the concrete reaches the design strength of demoulding, the formwork shall be demolished in an orderly manner according to the specifications. 8) For the transportation of the dismantled formwork from the lower floor to the upper floor, the reserved opening in the floor slab shall be used for manual transportation. The removed formwork shall be aluminium formwork system malaysia cleaned and coated with isolating agent in time. 3.6.2 Technical indicators (1) Aluminum alloy ribbed panels, various types of materials and plates should use 6061T6, 6082T6 or the mechanical properties of the above grades; (2) Specification of plane template: width 100600mm, length 6003000mm, thickness 65mm; (3) Specification of female corner template: 100100mm, 100125mm, 100150mm, 110150mm, 120150mm, 1301aluminium formwork manufacturers in china50mm, 140150mm, 150150mm, length 6003000mm; (4) Specification of positive corner template: 6565mm; (5) Common adjustable length of independent support: 19003500mm; (6) The spacing between the fulcrums of the wall formwork is 800mm. When the vertical uniform load is 30kN/m2 on the formwork, the maximum deflection should not exceed 2mm; the vertical uniform load on the formwork is 45kN/m2, and the holding time is greater than 2h At the time, there should be no local damage or bending, and the residual deformation after unloading should not exceed 0.2mm, and all welding points should be free of cracks or tears. 400, and should not exceed 2mm. 3.6.3 Scope of application Aluminum alloy formwork is suitable for wall, column, beam, slab and other concrete structure formwork construction, vertical structure external wall click here climbing formwork and internal wall and beam plate formwork construction at the same time, is currently widely promoted and applied in domestic residential standard floors. 3.6.4 Engineering case Multiple residential projects of Vanke (Vanke City, Golden City, Golden Mile Blue Bay, Metropolis, etc.), China Resources Vientiane City, Nanning Jiuzhou International, Guiyang Hotel, Songri Headquarters Building, Huizhou Chengjie International, Foshan Vanke Plaza Project, Zhuhai Vanke City Garden Project, Hangzhou Vanke Beichen Light Project, Fujian Vanke Putian Vanke City Project, Ningbo Vanke Jinyu Legend Project, Wenzhou Vanke Lingyuan Ecological Park Project, Shanghai Vanke Maqiao Base Project, Nanchang Metro Vanke Project, Nanning Haitian Triumph One No. items, etc. Click to view the full version: Notice from the Ministry of Housing and Urban-Rural Development on the promotion and application of '10 New Technologies for the Construction Industry (2017 Version)' Take the first-level construction engineer and move towards the project manager Recommended reading: The 2018 first-level construction engineer exam preparation plan for each subject is freshly released 2018 Class I Constructor Exam Preparation Class Course Free Trial Know Yourself and Know Yourself When the preparation test for the first-class constructor in 2020 is in progress, new friends are welcome to join us, work together, and actively prepare for the test. I hope you can get good test results in 2020. A value-added premium class in 2020 High-efficiency experimental class Worry-free customized class VIP signing special training camp and other classes are tailored for different students, taking you to efficiently prepare for the 2020 first-class constructor. Course Details >> Buy Course Now >> WeChat scans the code and pays attention to the public account of 'Class 1 Construction Engineer', Get 'point-raising materials' for free, and the exam will not fall behind! Scan the code into the group, enjoy special offers, ask questions, and make friends ? ?New Course Package for Level 1 Architect in 2020 Value Class ?Single subject 680 yuan ?economic ?Regulations ?management ?building ?Municipal ?Electromechanical ?highway ?Water conservancy ?All subjects 1980 yuan ?building ?Municipal ?Electromechanical ?highway ?Water conservancy ? ? ? Efficient experiment class ?Single subject 1380 yuan ?economic ?Regulations ?management ?building ?Municipal ?Electromechanical highway ?Water conservancy ?4360 yuan ?building ?Municipal ?Electromechanical ?highway ?Water conservancy

评论

此博客中的热门博文

High quality fingerprint lock supplier

High quality fingerprint lock supplier dynaco is the first largest brand of smart lock under Shenzhen Jujin Technology Co., Ltd., specializing in R & D and production of smart locks, full-automatic electronic cabinet locks supplier smart locks, anti-theft smart locks, fingerprint locks, password locks, etc., headquartered in Shenzhen, under the original group, for many years, will set up a separate group for the business of smart locks In the era of intelligence, Tenneco is committed to building a "star fingerprint door lock manufacturers brand of domestic smart lock" and becoming an excellent brand in the field of anti-theft door lock in the era of intelligence. The second magic weapon: electronic password lock with password appears earlier than fingerprint lock. Many friends have seen it in TV movies or safes. Password lock is an important auxiliary function of fingerprint lock. Users can use this function flexibly to solve many daily problems. For example, ...

a manufacturing method of financial

Patent name: a manufacturing method of financial equipment information collection system based on handheld terminal technical field: the utility model relates to an information collection system, in particular to a financial equipment information collection system based on a handheld terminal. Background technology: as a high-tech product closely combined with optics, mechanics, electronics and software applications, scanning gun is the third generation of main computer input equipment after keyboard and mouse. Since the birth of the scanning gun, it has been developed rapidly and widely used. From the most direct pictures, photos, films to all kinds of drawings, graphics and documents, the scanning gun can be used to input into the computer, so as to realize the processing, management, use, storage or output of these image information. As a timely, accurate, reliable and economical data input method, barcode has been adopted by logistics information system. It has been widel...

The utility model relates

The utility model relates to a screw driver, in particular to an RFID induction screw driver. Background technology: with the development of the national economy and the rapid advancement of urbanization, the number of elevators also increases rapidly. The safe operation of elevator is related to the safety of people's life and property. "Three by products, seven by maintenance" elevator safety mainly depends on the usual maintenance and maintenance. As a special equipment, elevator maintenance is divided into half monthly maintenance, monthly maintenance, quarterly maintenance, semi annual maintenance, annual maintenance and maintenance when there is a fault. The elevator maintenance process is complex and there are many processes, which requires high requirements for personnel maintenance management. In many cases, effective supervision means cannot be carried out. Technical implementation elements: in view of the shortcomings of the existing technol...